Control of sediment at lateral intake with using submerged vanes in river bend

Document Type : Research Paper

Authors

1 گروه سازه های آبی، دانشکده کشاورزی، واحد اهواز، دانشگاه آزاد اسلامی، اهواز، ایران

2 Associate Professor, Islamic Azad University, Ahvaz Branch

Abstract

In this research, in order to determine the performance of distance of submerged vanes on sediment transport to inlet a physical model was performed in a 180 degree bend. For this purpose, experiments were carried out in a laboratory rectangular channel made of Plexiglas at 180 degree bend, filled with sedimentary bed under clear water condition. In this research a series of experiments were done by insert two rows of vanes made of Plexiglas in front of lateral intake. Experiments were done by using two rows of parallel vanes with four different discharges under with vanes and without vanes conditions. In each experiment, the main channel discharge and diversion channel discharge, sediment discharge through the diversion and transmission were measured. The results of this research showed that the performance of the parallel submerged vanes for path of sediments diverting are depends on distance of vanes and suitable performance for reduce of sediment transport to intake was observed for the relative height of 0.32 (34 percent). Also, entering water rate is directly proportional with entering sediment rate and entering sediment rate were increased with increasing of entering water rate in all distances of vanes.

Keywords


1) حسن پور، ف.، ایوب زاده، ع. و قدسیان، م. 1390
ملکرد کنترل رسوب صفحات مستغرق مرکب در دهانه
آبگیر جانبی 90 درجه، مجله پژوهش های آبخیزداری،
.1290- شماره 92 ، پائیز ، ص 1
2) نظری، س. و شفاعی بجستانی، م. 1389 . تاثیر زاویه
انحراف آبگیر بر نسبت دبی و رسوب ورودی به آبگیر در
خم 90 درجه همگرا، مجله پژوهش های آبخیزداری،
..78- شماره 87 ، تابستان 89 ، ص 87
. 3) نشریه شماره 509 دفتر نظام فنی اجرایی، 1388
راهنمای آبگیری از رودخانه و حفاظت آن، معاونت برنامه
ریزی و نظارت راهبردی رییس جمهور.
4) Barkdoll, B. D., Hagen, B.L. and Odgaard, J.
1995. Sediment exclusion at hydropower intakes
using submerged vanes. Proc. of Waterpower
conference, pp 368-377.
5) Barkdoll, B.D., Ettema, R. and Odgaard, J.
1999. Sediment control at lateral diversion: limits
and enhancements to vane use. Journal of Hydraulic
Engineering, ASCE, 124(4): 862-870.
6) Nakato, T., Ogden, F. L. 1998. Sediment
control at water intakes along sand-bed rivers.
Journal of Hydraulic Engineering, ASCE,
124(6):589-596.
7) Neil, C. R. 1973. Guide to bridge hydraulics.
Road and Transportation Association of Canada,
University of Toronto, Canada.
8) Odgaard, J. and Wang, Y. 1991. Sediment
management with submerged vanes. I: Theory.
Journal of Hydraulic Engineering,
ASCE,117(3):267-283.
9) Oliveto, G. and Hager, W.H. 2002. Temporal
evaluation of clear-water pier and abutment scour.
Journal of Hydraulic Engineering, ASCE.
128(9)811-820.
10) Raudkivi, A. J., Ettema, R. 1983. Clear-water
scour at cylindrical piers. Journal of Hydraulic
Engineering, ASCE, 109(3):338-350.
11) Tan, S.K., Yu, G., Lim, S.Y. and Ong, M.C.
2005. Flow structure and sediment motion around
submerged vanes in open channels. Journal of
Waterway, Port, coastal and Ocean Engineering,
131(30:132-136.
22 مهار رسوب به دهانه آبگیر جانبی با استفاده از صفحات مستغرق در خم رودخانه